The wrap also gave me an idea of the outside of the building.
––This is the view from the east side—
—They got the west side siding done in just a few hours. Note: I am not installing any brick wainscot on the west. There is no brown edging just tan from top to bottom—
—The tan siding will come down to the brown drip edge. I’ll be finishing the bottom three feet with stone veneer—
You’ll notice the standing water. It must have rained 3″ over a two day span. That did slow the crew down but that’s all part of the process. At least now with the roof on, the inside stayed much drier.